Skip Navigation
Skip to main content
Florida Department of Environmental Protection
MENU
Permitting Application
Toggle navigation
Home
Number of Permits by Office
This data is current as of: Wednesday, November 10, 2021
Select a Permit Type to View Specific Information
Permit Type
Total Under Review
Air - Construction Permit
2
Air - Operation Permit
2
Air - Title V Operation Permit
1
IW Dewatering Operations
1
Joint Application Electronic Submittal
2
Water - Domestic Wastewater Collection/Transmission System
25
Water - Domestic Wastewater Facility Permit
2
Water - Domestic Wastewater Type I Wastewater Treatment Plant Permit
5
Water - Domestic Wastewater Type II Wastewater Treatment Plant Permit
6
Water - Domestic Wastewater Type III (less than 10,000 gpd) Wastewater Treatment Plant Permit
1
Water - Domestic Wastewater Type III Wastewater Treatment Plant Permit
11
Water - Drinking Water Distribution System General Permit
13
Water - Drinking Water Distribution System Permit
4
Water - Drinking Water Treatment Construction Permit
9
Water - ERP Exemption Permit
34
Water - ERP Formal Determination
9
Water - ERP Modifications
9
Water - ERP Noticed General Permit
33
Water - Individual With No Conceptual Approval Permit
83
Water - Industrial Wastewater Concrete Batch Plant Permit
2
Water - Industrial Wastewater Facility Permit
1
Water - Industrial Wastewater Group 10B - Other Facility Permit
1
Water - Industrial Wastewater Group 7D, Design Daily Flow 50,000 or Less GPD Permit
1
Water - Industrial Wastewater Group 8D, Design Daily Flow of 50,000 or Less GPD Permit
2
Water - Industrial Wastewater Group 9B, Recycling 10,000 or Less GPD Permit
1
Water - Mangrove Alterations Permit
2
Water - State 404 Exemption
3
Water - State 404 General Permit
98
Water - State 404 Individual Permit
100
Water - State 404 No Permit Required
31
Water - State 404 Regional General Permit
2
Water - WOTUS Determination with WMD Formal
11