Report Run Date: 04/25/2021        Last Data Refresh: 04/24/2021        Report Generated from DOPPLER
 
Facility ID: 9601323
Facility Name: DRYER PROPERTY
 
09/18/2019 Editable Letter Activity Hodges, Zachary L.
Activity Title: Compliance Assistance Offer Letter Activity Status: Open
09/18/2019 Site Inspection Activity Closed Hodges, Zachary L.
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 09/18/2019
Activity Closed Date: 09/18/2019 Activity Closed By: HODGES_ZL_1
Events:
Event Type: Activity has been finished Date: 09/18/2019
Comment: Finished
05/24/2018 Editable Letter Activity Hodges, Zachary L.
Activity Title: Compliance Assistance Offer Letter Activity Status: Open
05/14/2018 Site Inspection Activity Closed Hodges, Zachary L.
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 05/14/2018
Activity Closed Date: 05/24/2018 Activity Closed By: HODGES_ZL_1
Events:
Event Type: Activity has been finished Date: 05/24/2018
Comment: Finished
08/25/2015 Editable Letter Activity Hodges, Zachary L.
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 08/25/2015
Comment: Finished
Attachments:
Attachment Date: 08/25/2015 User: HODGES_ZL_1
Description: NCL 8.25.15
View Attachment
08/19/2015 Site Inspection Activity Closed Hodges, Zachary L.
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 08/19/2015
Activity Closed Date: 08/25/2015 Activity Closed By: HODGES_ZL_1
Events:
Event Type: Activity has been finished Date: 08/25/2015
Comment: Finished
08/17/2011 Editable Letter Activity Krazit, Jason L.
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 08/17/2011
Comment: Finished
Events:
Event Type: Document has been sent Date: 08/17/2011
Comment: Sent on Wed Aug 17 00:00:00 EDT 2011
Attachments:
Attachment Date: 08/17/2011 User: KRAZIT_JL_1
Description: NCL
View Attachment
08/16/2011 Site Inspection Activity Closed Krazit, Jason L.
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 08/16/2011
Activity Closed Date: 08/17/2011 Activity Closed By: KRAZIT_JL_1
Events:
Event Type: Activity has been finished Date: 08/17/2011
Comment: Finished
02/02/2011 Editable Letter Activity Krazit, Jason L.
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 02/02/2011
Comment: Finished
Events:
Event Type: Document has been sent Date: 02/02/2011
Comment: Sent on Wed Feb 02 00:00:00 EST 2011
Attachments:
Attachment Date: 02/02/2011 User: KRAZIT_JL_1
Description: NCL
View Attachment
01/31/2011 Site Inspection Activity Closed Krazit, Jason L.
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 01/31/2011
Activity Closed Date: 02/02/2011 Activity Closed By: KRAZIT_JL_1
Events:
Event Type: Activity has been finished Date: 02/02/2011
Comment: Finished
01/27/2010 Site Inspection Activity Closed Krazit, Jason L.
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 01/27/2010
Activity Closed Date: 01/27/2010 Activity Closed By: KRAZIT_JL_1
Events:
Event Type: Activity has been finished Date: 01/27/2010
Comment: Finished
01/27/2010 Editable Letter Activity Krazit, Jason L.
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Activity has been finished Date: 01/27/2010
Comment: Finished
Attachments:
Attachment Date: 01/27/2010 User: KRAZIT_JL_1
Description: NCL
View Attachment
12/18/2009 Enforcement Tracking Activity Gillman, Mark
Activity Status: Open
04/14/2009 Editable Letter Activity Krazit, Jason L.
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
04/10/2009 Site Inspection Activity Closed Krazit, Jason L.
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 04/10/2009
Activity Closed Date: 04/14/2009 Activity Closed By: KRAZIT_JL_1
06/04/2008 Attachment Krazit, Jason L.
06/04/2008 Editable Letter Activity Krazit, Jason L.
Activity Title: 1st Non-Compliance Letter Activity Status: Closed
06/04/2008 Enforcement Referral Activity Krazit, Jason L.
Activity Result: Accepted Activity Status: Closed
Activity Closed Date: 12/18/2009
Events:
Event Type: Activity/Document was accepted on this date Date: 12/18/2009
Comment: Accepted by: GILLMAN_M
Events:
Event Type: Activity has been finished Date: 12/18/2009
Comment: Finished
Events:
Event Type: Activity has been submitted for approval Date: 06/04/2008
Comment: This facility was previously refferred by mail. April 21, 2006.
06/04/2008 Site Inspection Activity Closed Krazit, Jason L.
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 06/04/2008
Activity Closed Date: 10/08/2008 Activity Closed By: KRAZIT_JL_1
Comments:
Comment Date: 04/12/2006 User: HENDERSON_SA_1
Description: RD: Visuals, LCD, SIR (catholic Protection) Tank Tightness test
06/04/2008 Site Inspection Activity Closed Krazit, Jason L.
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 06/04/2008
Activity Closed Date: 06/04/2008 Activity Closed By: KRAZIT_JL_1
Comments:
Comment Date: 04/12/2006 User: HENDERSON_SA_1
Description: SIR Report O.K.
06/04/2008 Violation Closed Krazit, Jason L.
Significance: SNC-B Status: Closed
Criteria ID: 1132
Rule: 62-761.800(2)(b)
Comments: Unmaintained systems are defined in Rule definition #71 as: "a storage tank system that was not closed in accordance with Department rules"; or, "an out-of-service tank system that was not returned to service within the 2, 5 or 10 year period." Note that a system can be out-of-service for 1, 2, 5 or 10 years before becoming unmaintained, and should be in compliance if out-of-service requirements are met. Unmaintained systems are not in violation until after being unmaintained for more than 90 days without closure or being returned to service. This item also covers tank systems found on a piece of property that were not previously registered. Document all time frames discussed with the facility owner/operator. See Rule definition #13 "Discovery"
10/15/2007 Site Inspection Activity Closed Krazit, Jason L.
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 10/15/2007
Activity Closed Date: 10/15/2007 Activity Closed By: KRAZIT_JL_1
06/24/2007 Attachment Krazit, Jason L.
06/24/2007 Editable Letter Activity Krazit, Jason L.
Activity Title: District Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 06/24/2007
Comment: Sent on Sun Jun 24 15:10:42 EST 2007
Attachments:
Attachment Date: 06/24/2007 User: KRAZIT_JL_1
Description: NCL Report
View Attachment
06/24/2007 Site Inspection Activity Closed Krazit, Jason L.
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 06/24/2007
Activity Closed Date: 06/24/2007 Activity Closed By: KRAZIT_JL_1
Comments:
Comment Date: 04/12/2006 User: HENDERSON_SA_1
Description: RD: visual
06/24/2007 Violation Closed Krazit, Jason L.
Significance: SNC-B Status: Closed
Criteria ID: 1132
Rule: 62-761.800(2)(b)
Comments: Unmaintained systems are defined in Rule definition #71 as: "a storage tank system that was not closed in accordance with Department rules"; or, "an out-of-service tank system that was not returned to service within the 2, 5 or 10 year period." Note that a system can be out-of-service for 1, 2, 5 or 10 years before becoming unmaintained, and should be in compliance if out-of-service requirements are met. Unmaintained systems are not in violation until after being unmaintained for more than 90 days without closure or being returned to service. This item also covers tank systems found on a piece of property that were not previously registered. Document all time frames discussed with the facility owner/operator. See Rule definition #13 "Discovery"
04/12/2006 Violation Closed Henderson, Sylvia A.
Significance: Minor Status: Closed
Criteria ID: 1001
Rule: 62-761.400(1)(a), 62-761.400(1)(b)
Comments: Does STCM accurately reflect the tanks at the facility? This question concerns the registration process and payment of fees only - it is not about accurate registration. Check the number of tanks listed on the registration placard. Can the facility owner/operator produce a registration form to document submittal to DEP? At the time of tank closure, a registration form should be submitted showing the change in tank codes.
Comments:
Comment Date: 04/12/2006 User: HENDERSON_SA_1
Description: Line Leak detection Last 1/23/2006 Due 1/23/2007
04/12/2006 Editable Letter Activity Henderson, Sylvia A.
Activity Title: District Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 04/12/2006
Comment: Sent on Wed Apr 12 12:00:00 EST 2006
Comments:
Comment Date: 04/12/2006 User: HENDERSON_SA_1
Description: All piping aboveground no contact with soil
04/12/2006 Editable Letter Activity Henderson, Sylvia A.
Activity Title: District Non-Compliance Letter Activity Status: Closed
Events:
Event Type: Document has been sent Date: 04/12/2006
Comment: Sent on Wed Apr 12 12:00:00 EST 2006
Comments:
Comment Date: 04/12/2006 User: HENDERSON_SA_1
Description: No violations found
04/12/2006 Site Inspection Activity Closed Henderson, Sylvia A.
Activity Result: Major Out of Compliance Activity Status: Closed
On-Site Start Date: 04/12/2006
Activity Closed Date: 04/12/2006 Activity Closed By: HENDERSON_SA_1
Comments:
Comment Date: 04/12/2006 User: HENDERSON_SA_1
Description: Manual tank guaging
04/12/2006 Violation Closed Henderson, Sylvia A.
Significance: SNC-B Status: Closed
Criteria ID: 192
Rule: 800(3)(c)1
Comments:
Comment Date: 04/12/2006 User: HENDERSON_SA_1
Description: Catholic Last 3/1/2004 Due 3/1/2007
04/12/2006 Violation Closed Henderson, Sylvia A.
Significance: Minor Status: Closed
Criteria ID: 1124
Rule: 62-761.710(3)(a), 62-761.710(3)(b), 62-761.710(3)(c), 62-761.710(3)(d), 62-761.710(3)(e), 62-761.710(3)(f), 62-761.710(3)(g), 62-761.710(3)(h)
Comments: The Rule cites does not list routine operation and maintenance records. If the problem involves failure to perform according to the standards in each of the following areas, then note these items in addition to the paperwork for this rule: a. Periodic inspections and tank system measurements - rules 62-761.610(3)(a)1, 62-761.700(4)-(5) & 62-761.700(6) b. Supporting claims for equipment in use at facility. - rule 62-761.600(1)(a)3 c. History of what has been done at facility - see 62-761.500 rules. d. Cathodic protection system history - rules 62-761.500(1)(e)1 & 62-761500(1)(e)3 e. Site suitability determination - this document must be updated when site conditions change- rule 62-761.600(1)(f) f. Vapor monitoring plan - this document must be updated annually - rule 62-761.600(1)(g) g. Closure reports - rule 62-761.800(3)(d) h. Single check valve - PSSC documentation that no other buried valves exist - rule 62-761.610(3)(a)1
Comments:
Comment Date: 04/12/2006 User: HENDERSON_SA_1
Description: Tank Tightness test last 3/1/2004 Due 3/1/2007 with SIR
03/24/2005 Violation Closed Unknown, User
Significance: SNC-B Status: Closed
Criteria ID: 1132
Rule: 62-761.800(2)(b)
Comments: Unmaintained systems are defined in Rule definition #71 as: "a storage tank system that was not closed in accordance with Department rules"; or, "an out-of-service tank system that was not returned to service within the 2, 5 or 10 year period." Note that a system can be out-of-service for 1, 2, 5 or 10 years before becoming unmaintained, and should be in compliance if out-of-service requirements are met. Unmaintained systems are not in violation until after being unmaintained for more than 90 days without closure or being returned to service. This item also covers tank systems found on a piece of property that were not previously registered. Document all time frames discussed with the facility owner/operator. See Rule definition #13 "Discovery"
Comments:
Comment Date: 09/10/2020 User: GODWIN_MR_1
Description: Meaghan Godwin Final Installation Inspection On-site at 12:15 P.M. with Mrs. Hilda Enriquez with Westar, Manny Cordero, Project Manager, and Coraliz Cordero from Kinetik Industrial Group, LLC (PCC #: 1256903, (561) 231-1203) doing business as Fuel Services Management, Inc. for the final installation inspection of (3) New Metal Products (EQ-333) double walled, underground storage tanks (USTs): One (1) 10,000-gallon storing regular gasoline, one (1) 8,000 gallon compartmentalized to store 4,000-gallon premium gasoline and 4,000-gallon diesel, and one (1) 6,000-gallon compartmentalized to store 3,000-gallon E-85 and 3,000-gallon RED-90, as per plans. The DERM Approved Plans dated 01/29/2020 were on-site and coincided with the site layout. The requested surveys were provided. The current FDEP Registration Placard was available on-site. The Certificate of Financial Responsibility was current and available. The policy is being held with Crum & Forster Special Insurance Company and is running from 02/16/2020-02/16/2021. All the required tests were provided and had passing Test results. The Line Tightness Test, Annual Inline Leak Detector Test, Overfill Protection Test, Release Detection Test, and Breach of Integrity Tests were done by PSR, Inc. on 09/02/2020 and 09/11/2020 and passed. Electronic release detection is monitored through the Franklin Fueling Systems EVO-550. All functions were normal at the time of the inspection. The liquid status report was conducted. The sensors monitor the five (5) STP sumps, three (3) Annular Spaces, and three (3) dispensers. No alarms noted at the time of inspection. The visual and audio alarms appeared to be working properly. There are a total of three (3) dispensers on site. Dispensers’ 1-2 and 5-6 liners were dry, dispenser 3-4 contained product that was removed and the components checked for leaks. The shear valves appeared to be properly braced. Hoses and nozzles were intact. Fill port & vapor recovery lids were properly color-coded. Fill port & vapor recovery watertight caps contained gaskets and had tight seals. Fill port & vapor recovery spill containment buckets were dry. All the STP sumps were dry and contain mechanical line leak detectors. No corrosion noted on STP components. The piping boots were pulled back for release detection and the sensors were correctly positioned below piping. There were a total of (6) monitoring wells on site. The Approved Plans only call for 5 monitoring wells. All monitoring well concrete pads and lids were intact and properly color coded. All monitoring well watertight caps were locked or properly secured and contain gasket. All monitoring well collars/risers were at least 1 inch above the surface and the containment appears to be properly grouted. No visual evidence of free floating product or sheen observed, as well as no odors were detected during the inspection in all monitoring wells. All monitoring wells DTW/D was measured on 09/10/2020. On that date water column levels were determined adequate for release detection meeting the 3 ft. requirement. Class A Operator Training Certificate was available. Class C will be taught to new employees. A site diagram was drawn and pictures were taken. The Lat/Long coordinates have been updated on the STCM-Map. The facility has passed the Final Inspection. This report will be sent to Hilda Enriquez (hgenriquez@aol.com, hgenriquez@aol.com) Coraliz Cordero (ccordero@fuelservicesinc.com) and to Manny Cordero (mcordero@fuelservicesinc.com
03/24/2005 Legacy Activity Brooks, Addie
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
03/19/2004 Legacy Activity Brooks, Addie
Activity Name: NON-COMPLIANCE LETTER ISSUED Activity Status: Closed
03/18/2004 Violation Closed Unknown, User
Significance: SNC-B Status: Closed
Criteria ID: 187
Rule: 800(3)(b)1
Comments:
Comment Date: 12/25/2018 User: JARRETT_SE_1
Description: Received copies of the 09/12/2018 to 11/15/2018 monthly visual release detection inspection records for the AST systems at the facility. Records appear to correctly reflect the actual site conditions of the systems at the facility.
03/18/2004 Legacy Activity Brooks, Addie
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
03/18/2004 Violation Closed Brooks, Addie
Significance: Minor Status: Closed
Rule: 800(4)(a)&(b)
Comments:
Comment Date: 12/25/2018 User: JARRETT_SE_1
Description: Received copies of the 09/12/2018 to 11/15/2018 monthly visual release detection inspection records for the AST systems at the facility. Records appear to correctly reflect the actual site conditions of the systems at the facility.
03/04/2003 Violation Closed Unknown, User
Significance: SNC-B Status: Closed
Criteria ID: 192
Rule: 800(3)(c)1
Comments:
Comment Date: 11/30/2016 User: WILLIAMSON_KE_1
Description: 12/01/16 TCI
03/04/2003 Legacy Activity Brock, Melissa
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
03/04/2003 Violation Closed Brooks, Addie
Significance: Minor Status: Closed
Rule: 800(4)(a)&(b)
Comments:
Comment Date: 11/30/2016 User: WILLIAMSON_KE_1
Description: 12/01/16 TCI
04/16/2002 Violation Closed Brooks, Addie
Significance: Minor Status: Closed
Rule: 800(4)(a)&(b)
Comments:
Comment Date: 03/05/2015 User: WINKLER_MG_1
Description: 10K gallon DW UST for emergency generator. No deficiencies noted this date.
04/16/2002 Legacy Activity Brock, Melissa
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
04/16/2002 Violation Closed Unknown, User
Significance: SNC-B Status: Closed
Criteria ID: 192
Rule: 800(3)(c)1
Comments:
Comment Date: 03/05/2015 User: COLSON_NJ_1
Description: 15K & 20K Modern Welding Glasteel II USTs Installed in 2008.
04/24/2001 Violation Closed Brooks, Addie
Significance: Minor Status: Closed
Rule: 800(4)(a)&(b)
Comments:
Comment Date: 04/01/2013 User: MOLDENHAUER_HL_1
Description: Received tank tightness test from Discovery Tank Testing. Regular UL tank tested 2/19/2013 upon completion of Phoenix System installation. Passing results
04/24/2001 Legacy Activity Brooks, Addie
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
04/24/2001 Violation Closed Unknown, User
Significance: SNC-B Status: Closed
Criteria ID: 192
Rule: 800(3)(c)1
Comments:
Comment Date: 04/01/2013 User: CERIC_M_1
Description: Whole system cleaned and repainted. Piping cleaned and repainted. Spill bucket cleaned and repainted. Tank washed and clean. See attached photos.
06/10/2000 Legacy Activity Unknown, User
Activity Name: NON-COMPLIANCE LETTER ISSUED Activity Status: Closed
05/22/2000 Violation Closed Brooks, Addie
Significance: Minor Status: Closed
Rule: 400(1)-(2)
Comments:
Comment Date: 08/08/2011 User: DERY_WC_1
Description: Containment Integrity Plan for secondary specs and water recirculation provided and reveiwed by P.E. every two years.
05/22/2000 Legacy Activity Unknown, User
Activity Name: TANK ANNUAL COMPLIANCE INSPECTION Activity Status: Closed
05/22/2000 Violation Closed Brooks, Addie
Significance: Minor Status: Closed
Rule: 400(2)(a)6
Comments:
Comment Date: 08/08/2011 User: DERY_WC_1
Description: Containment Integrity Plan for secondary specs and water recirculation provided and reveiwed by P.E. every two years.
05/22/2000 Violation Closed Brooks, Addie
Significance: SNC-B Status: Closed
Rule: 400(3)
Comments:
Comment Date: 08/08/2011 User: DERY_WC_1
Description: Containment Integrity Plan for secondary specs and water recirculation provided and reveiwed by P.E. every two years.
05/22/2000 Violation Closed Unknown, User
Significance: Minor Status: Closed
Rule: 800(3)(b)2a
Comments:
Comment Date: 08/08/2011 User: KOENIG_EJ_1
Description: Pre-slab inspection of hydrant pit F1A. Slab re-enforcement consist of one in a quarter inch dowels all around with #5 bar wet set ~6 inches up from the bottom around the piping. The pad is 14 inches deep. Pad will be 7500 PSI.
05/22/2000 Violation Closed Brooks, Addie
Significance: Minor Status: Closed
Rule: 800(4)(a)&(b)
Comments:
Comment Date: 08/08/2011 User: MURLEY_A_1
Description: East Tank Farm (5) Vertical, single walled, steel ASTs. Tanks are located within a sealed concrete containment area. Interior of containment area measured: 50' x 68' x 3' (76,296 gallons). Containment area has been sealed with PPG Industries sealant DEP EQ-455 No problems noted with integrity of the concrete. Slight surface cracking noted near top of wall, but volume of containment is well above 110% of the regulated tank). No drains in secondary containment, rainwater removed with a pump according to operator. An additional coat of sealant will be added according to Manuel Sequera. Unregulated tanks within containment area: - Tank # T1E - Liquid Asphalt - Tank # T2E - Liquid Asphalt - Tank # T3E - Liquid Asphalt - Tank # T4E - Empty Regulated tank within containment area: - Tank # T5E - 20,000 gallon single walled steel AST containing mineral spirits. No tank equipment approval number, but tank was certified by a professional engineer form TEAM Consultants, Inc. indicating the tank meets/exceeds UL142 standards. Tank T5E is only used to fill Tank #T6. Tank #T5E is not a flow through process tank because it is used for the storage of regulated substance before its introduction into the process. There is not a steady, variable, recurring, or intermittent flow of materials during the operation of the process. Release Detection: Visual inspection of storage tank system components including secondary containment area. Tank # T5E is equipped with: -Exterior coating. -Product labels at remote fills. -Normal venting and emergency venting (according to PE certification). (2) Remote fills. -Remote fill within containment area and within a spill containment bucket. Spill containment drain valve closed. This fill is not usually used according to operator. Tank is mainly filled by railcar according to operator. Remote fill at railcar unloading area has no spill containment (not required, rail car unloading operations exempt). Remote fill from rail car unloading area is coated, aboveground steel piping Supply line is approximately 160 feet of coated, aboveground, steel piping which runs through the warehouse, then to Tank #T6. Supply line is equipped with a manual isolation valve at tank outlet. Supply line is not equipped with an anti-siphon valve. Installation application indicates piping is 4 inch, but piping through warehouse appears smaller. Antisiphon device required for small diameter piping. Forwarding pump located within containment area in order to pump mineral spirits to Tank #T6. Piping has been repainted since last inspection. Very slight rust noted on piping before entry into warehouse, to be repainted according to operator. Tanker loading area north of containment (tight fill fitting off the supply line to Tank #T6). Not often used according to operator (tanker loading operations exempt). -Overfill protection - Concrete secondary containment. Fuel level sight gauge (unknown make/model) is present, but is not visible from railcar unloading area. -Recommend electrical grounding. No leakage noted. Other unregulated tanks on site: Tank #T7 Stormwater Tank #T8 Spinks (clay) slurry
05/22/2000 Violation Open Unknown, User
Significance: SNC-B Status: Open
Criteria ID: 187
Rule: 800(3)(b)1
Comments:
Comment Date: 08/08/2011 User: DERY_WC_1
Description: Containment Integrity Plan for secondary specs provided and reveiwed by P.E. every two years.
04/30/1999 Violation Closed Unknown, User
Significance: SNC-B Status: Closed
Criteria ID: 192
Rule: 800(3)(c)1
04/30/1999 Violation Closed Brooks, Addie
Significance: Minor Status: Closed
Rule: 800(4)(a)&(b)
Comments:
Comment Date: 03/02/2010 User: GOMEZ_AE_1
Description: 11/24/09 PPRAQD issued TCAR review comments for TCAR dated 11/17/09. As petroleum contamination was identified and/or discovered during the tank closure assessment, a sitte assessment is required pursuant to Chapter 62-770, FAC.
04/30/1999 Violation Closed Brooks, Addie
Significance: Minor Status: Closed
Rule: 800(2)(a)1
Comments:
Comment Date: 03/02/2010 User: GILLMAN_M
Description: This enforcement involves this facility and the facility that is on contiguous property (Fac. No. 9811699), identified as the City of Chipley WWTP. The enforcement actions tracked here have to do with the closure of an underground emergency generator tank.
04/30/1999 Violation Closed Brooks, Addie
Significance: Minor Status: Closed
Rule: 800(3)(a)1
Comments:
Comment Date: 03/02/2010 User: JARRETT_SE
Description: A thirty-day late payment letter was issued to Mr. Thomas. The final payment of $1,200.00 was due by January 24, 2010 but has not been received by the Department. Also, the August 2009 to October 2009 monthly release detection inspection records and CSLD printouts for the Regular UST were to be submitted to the Department as they were completed. However, these records have not been submited to the Department as required per the executed Model Consent Order (OGC #09-3010). Mr. Thomas was advised to submit the payment and records by March 16, 2010.
04/30/1999 Legacy Activity Unknown, User
Activity Name: TANK COMPLIANCE RE-INSPECTION Activity Status: Closed
Completion Notes: OBTAINED NEW OWNER ADDRESS